Combined Heat and Power CHP

Two new, high-performance gas turbine plants with heat recovery steam generators are being built in the Gutleutviertel district. Here, heat and electricity will continue to be generated simultaneously. The combined heat and power plant, which is mainly operated with hard coal, is expected to be completely converted to initially natural gas as early as 2026. In the course of the conversion and modernization, the existing coal-fired units will be replaced by two new units, each with a gas turbine with heat recovery steam generator. These modernizations contribute to the decarbonization of energy generation: In this way, the CO₂ emissions of the generation park can be continuously reduced. In the future, the focus will be on the use of CO₂-free gases - such as climate-neutral hydrogen.

  • Foundations for the boiler houses
  • the new construction of the GT machine house including steel construction and the GT compressor including foundations
  • the new construction of the ancillary facilities & enclosures for the main transformer as well as the facades

About us

Our company is looking back on a successful building tradition since 1892. Heitkamp stands for the optimal interaction of engineering know-how and constructional realisation.

Contact

HEITKAMP
Industrial Solutions GmbH
Bonsiepen 9 -11
45136 Essen, Germany

+49 (0) 201 / 8 36 90 - 0

+49 (0) 201 / 8 36 90 -199

Socials

© 2024 HEITKAMP Industrial Solutions GmbH. All Rights reserved.
You are using an outdated browser. The website may not be displayed correctly. Close