Have any Questions? +01 123 444 555

Concreting the Bunker Building – Construction Progress in Delfzijl

EEW Energy from Waste is building a sewage sludge mono-incineration plant (MSWI) at its Dutch site in Farmsum/Delfzijl to supplement the existing thermal waste utilisation plant with three lines.

This waste incineration plant will be built as a single-line stationary fluidised bed incineration plant for steam generation and with downstream multi-stage flue gas cleaning. Heitkamp Industrial Solutions GmbH is once again responsible for the technical organisation and project management of the construction work for the plant in Delfzijl.

Go back

About us

Our company is looking back on a successful building tradition since 1892. Heitkamp stands for the optimal interaction of engineering know-how and constructional realisation.

Contact

HEITKAMP
Industrial Solutions GmbH
Bonsiepen 9 -11
45136 Essen, Germany

+49 (0) 201 / 8 36 90 - 0

+49 (0) 201 / 8 36 90 -199

Socials

© 2024 HEITKAMP Industrial Solutions GmbH. All Rights reserved.
You are using an outdated browser. The website may not be displayed correctly. Close