18.12.2023
Concreting the Bunker Building – Construction Progress in Delfzijl
EEW Energy from Waste is building a sewage sludge mono-incineration plant (MSWI) at its Dutch site in Farmsum/Delfzijl to supplement the existing thermal waste utilisation plant with three lines.
This waste incineration plant will be built as a single-line stationary fluidised bed incineration plant for steam generation and with downstream multi-stage flue gas cleaning. Heitkamp Industrial Solutions GmbH is once again responsible for the technical organisation and project management of the construction work for the plant in Delfzijl.